Need segment-level traffic data?

Identify traffic patterns street by street and analyze the exact corridors that matter to your project.

Get insights
traffic map

Cherry County, Nebraska Traffic Counts

This page delivers traffic analytics for Cherry County, Nebraska. Our metrics are calculated with multi-sourced, cross-verified data from real-world mobile and sensor networks, and averaged for Cherry County, Nebraska among 253 road miles divided in 835 segments. Our metrics go beyond simple volume counts to provide actionable insights on traffic intensity, congestion, commercial vehicle flow, and network performance with highest possible granularity (average segment length is 1,600 ft). Whether you are evaluating a new retail location, planning logistics routes, or assessing infrastructure needs, this data helps you move from assumptions to certainty.
Data sourced from TrafficZoom's proprietary analytics platform.
Data current as of:
Q3 2026
Find my place
total traffic icon

Total Traffic Volume & Performance

Traffic

927

Trucks

14.9%

Average travel time

33.3 min

Drivers’ average age

51.0 yrs

Drivers’ average income

$59,474

Our data indicates an estimated average traffic volume of 927 vehicles per day in Cherry County, Nebraska that results in 152,033 vehicle-miles traveled per day (≈55.5 million per year). The traffic stream is comprised of an average of 1 truck for every 7 vehicles. Typical time spent behind the wheel per trip is 33.3 minutes, which already accounts for delays at signals, intersections, and congestion.

Analytical insight

When compared to the Nebraska state averages: At 927 vehicles per day, the average monitored road in Cherry carries 74% less traffic than the state average of 3,598 vehicles per day - a critical factor for logistics and site planning. Network-wide, Cherry accounts for about 0.3% of Nebraska's statewide total, at 152,033 vehicle-miles traveled per day (≈55.5 million per year). At 33.3 minutes, the average travel time matches the state level closely. By volume, Cherry's 927 vehicles per day outpaces 29% of counties in Nebraska. Its average travel time of 33.3 minutes is longer than 27% of counties in Nebraska.

Highway vs. Non-Highway Traffic Analysis

highway traffic icon

Highway Traffic

Traffic

1,166

Trucks

15.8%

Average travel time

34.8 min

Drivers’ average age

51.2 yrs

Drivers’ average income

$60,104

A significant volume of traffic in Cherry County, Nebraska utilizes the highway network. The average highway carries 1,166 vehicles per day, 114% more than the average non-highway road in the same area, which carries 546 vehicles per day. That average covers 182 highway road miles divided in 514 segments (average segment length 1,866 ft), together carrying 130,241 vehicle-miles traveled per day (≈47.5 million per year). 50% of counties in Nebraska move less traffic on their highways. Trucks constitute 15.8% of highway traffic.

Analytical insight

The concentration of trucks on highways (15.8%) is 10% lower than the state average for similar road classifications. This indicates Cherry serves as a primarily local traffic hub. For logistics operators, this validates the importance of local access. Cherry's highway truck share (15.8%) is higher than 73% of counties in Nebraska. 8% of counties in Nebraska see fewer highway trucks per day than Cherry's roughly 185.
non-highway traffic icon

Non-highway traffic

Traffic

546

Trucks

9.4%

Average travel time

30.8 min

Drivers’ average age

50.0 yrs

Drivers’ average income

$57,302

The non-highway road network in Cherry County, Nebraska supports a substantial volume of traffic. The average non-highway road carries 546 vehicles per day, 53% less than the average highway in the same area, which carries 1,166 vehicles per day. That average covers 71 non-highway road miles divided in 321 segments (average segment length 1,174 ft), together carrying 21,792 vehicle-miles traveled per day (≈8.0 million per year). Trucks constitute 9.4% of non-highway traffic.

Analytical insight

Non-highway roads carry a truck concentration that's 41% lower than the highway network. 27% of counties in Nebraska see shorter overall travel times than Cherry. Cherry's average driver income exceeds 16% of counties in Nebraska. 49% of counties in Nebraska have a younger driver population than Cherry.

Time-of-Day & Seasonal Patterns

peak hours icon
Peak Traffic Windows
Weekday peaks:
AM peak 7:00 AM–12:00 PM and PM peak 3:00 PM–7:00 PM, with volumes reaching approximately 75% higher than the daily average.
Weekend traffic:
Weekend volumes run about 18% below weekday levels.
seasonal traffic icon
Seasonal Fluctuation
Busy season:
June–August is the high season, with volumes +24% versus the annual average.
Lowest month:
January is the quietest month, with volumes -32% versus the annual average.

Analytical insight

In Cherry County, Nebraska, the peak hour concentrates about 7% of the day's traffic, and seasonal swing is pronounced at +24% in high season.

Traffic Flow Profile Comparison

Metric

Cherry

Nebraska
Average

Difference

Traffic

927

3,598

-74.2%

Truck % (Total Traffic)

14.9%

11.5%

+29.4%

Truck % (Highway)

15.8%

17.6%

-9.9%

Avg. Travel Time

33.3 min

33.0 min

+0.8%

Data Sources & Methodology

The data presented on this page is derived from TrafficZoom's proprietary analytics platform, which aggregates and normalizes information from multiple sources, including:

Mobile device location data (anonymized and aggregated)

Road sensor networks and traffic counters

Historical traffic pattern databases

Public traffic count programs published by the

NebraskaDepartment of Transportation

Historical traffic pattern databases

U.S. Census Bureau
All metrics represent estimates based on statistical modeling and are intended for strategic planning purposes.
link arrow icon
Data current as of:
Q3 2026

Explore further

TrafficZoom platform

— street-level analytics and custom corridor reports.

Map AI

— demographics, housing and mobility data.

Explore Other Counties

Need segment-level traffic data?

Identify traffic patterns street by street and analyze the exact corridors that matter to your project.